-
Assigning Space
23:38
-
Adding Zone
04:49
-
Heating and Cooling Load Calculation
19:58
-
Placing Air Terminal, VAV and AHU
22:13
-
Duct Routing – Automatic Method
12:17
-
Duct Routing – Manual Method
11:39
-
Duct Routing – Manual Method – Continued
07:14
-
Duct Routing – Manual Method – Continued1
07:06
-
Duct Sizing
12:52
-
Duct Sizing – Continued
08:29
-
Placing FCU, Pump, Chiller, Cooling Tower
18:29
-
Chiller Water (Hydronic) Piping
13:53
-
Chiller Water (Hydronic) Piping – Continued
11:13
-
Chiller Water (Hydronic) Piping – Continued1
10:13
-
Chiller Water (Hydronic) Piping- Continued2
11:43
-
Placing Valves
02:53
-
Pipe Sizing
10:58
-
Adding Ventilation for Kitchen and Restroom
13:06
-
Dimensioning, Section Views and Callouts
08:49
-
Creating Duct Schedule
05:59
-
Creating Duct Pressure Loss Report
02:57
-
Creating Pipe Pressure Loss Report
02:35